, ,
1–2 minutes

READ

Permit Sought for Oilfield Waste Disposal Well Southwest of El Campo

Paloma Operating seeks a permit for an oilfield wastewater disposal well southwest of El Campo, with injection nearly 6,000 feet underground.

EL CAMPO — A Corpus Christi oil and gas operator wants to dispose of saltwater and other oilfield waste through a well about 6.3 miles southwest of El Campo, according to a notice published Nov. 14. The company is asking state regulators for permission to inject the waste nearly 6,000 feet underground.

Paloma Operating LLC, whose listed address is 711 N. Carancahua St., Suite 1400, in Corpus Christi, filed an application with the Railroad Commission of Texas for a non-commercial oil and gas waste disposal well permit.

The application identifies the proposed site as Stovall Lease, Well No. 1, in the Daboval (Frio #4 5500) Field in Wharton County. The injection zone would be the Frio Formation, between 5,870 and 5,960 feet below the surface — a 90-foot interval.

What would go into the well?

The notice describes the material as produced saltwater or other oil and gas waste. Produced water is water brought to the surface during oil and natural gas production. Disposal wells send that waste into underground rock formations rather than releasing it at the surface.

Paloma is seeking to inject the material into a porous formation described in the notice as not productive of oil or gas. The public notice does not give a proposed daily injection volume, a start date or a final permit decision.

Residents can request a public hearing

The application is still in the state permitting process. People who can show they may be adversely affected can submit a written request for a public hearing or ask for more information about the proposal.

The Nov. 14 notice provides a 15-day period from publication for written requests. They should be addressed to Environmental Services Section, Oil and Gas Division, Railroad Commission of Texas, P.O. Box 12967, Austin, TX 78711. Anyone considering a request should confirm the applicable deadline directly with the commission.

The filing describes what Paloma is requesting; it does not show that the Railroad Commission has approved the well or that wastewater injection has begun.

10 reads

Advertisement
Advertisement

Related Topics

Support local reporting

Reader contributions help Wharton Post cover public records, local meetings and breaking news across Wharton County.

Advertisement

Corrections & clarifications: See something that needs correcting? Review our Corrections Policy or email contact@whartonpost.com.